Backfilling Trenches and Other Excavations
Select and deposit backfill materials with special reference to the future safety of the pipes. Fill the lower portion of the trench by depositing approved backfill and bedding material in layers of 6 inches maximum thickness, and compact with suitable tampers to the density of the adjacent soil until there is a cover of not less than 12 inches ...